Fire River Gold Commences Underground Drill Program at the Nixon Fork Gold Mine

Fire River Gold Corp. (CVE:FAU) provided this update on its 28,000 metre diamond drill program at its Nixon Fork Gold Mine.

The press release is quoted as saying:

Fire River Gold Corp. is a near-term production company with an experienced technical team focused on bringing its flagship project, the Nixon Fork Gold Mine, back into production by Spring/Summer 2011. The Nixon Fork Gold Mine is a permitted and bonded mine with past production values averaging 1.4 opt (42 gpt). Facilities at the Nixon Fork Gold Mine include a 200 tpd floatation plant with a gravity gold separation circuit and a sulphide floatation circuit.

Click here to access the entire press release

View full post on Gold Investing News

, , , , , , , , ,

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Get Adobe Flash playerPlugin by wpburn.com wordpress themes

RSS Site FeedRSS Site Feed

© 1992-2012 DC2NET™, Inc. All Rights Reserved